What 490 CCTS obligated entities need to do by July 2026
Archived briefing. Written for the original 31 July 2026 filing date, which has passed.
Kartik Ranjan · Founder & Principal ConsultantArchived 21 November 2026. This briefing was written for the first CCTS filing date, 31 July 2026, set by the four-month rule in BEE’s Detailed Procedure. That date has passed, and Carbon Pulse reported on 8 October 2026 that the deadline for the first verified compliance data was extended by three months. The text below is kept as last updated on 27 July 2026. For the current position, including what entities that did not file face under the GEI Target Rules, see the CCTS Readiness Sprint.
Emission intensity targets under India’s Carbon Credit Trading Scheme now bind 490 obligated entities. That number is the sum of two notifications, not one: the Greenhouse Gases Emission Intensity Target Rules, 2025, effective 8 October 2025, which carried targets for 282 entities across aluminium, cement, chlor-alkali and pulp and paper; and the Amendment Rules notified on 13 January 2026, which added 208 more across petroleum refining, petrochemicals, textiles and secondary aluminium. The deadline for the first verified Measurement, Reporting and Verification (MRV) submission, covering compliance year FY 2025-26 against an FY 2023-24 baseline, is 31 July 2026, and BEE’s Detailed Procedure puts the verified report in front of BEE and the State Designated Agency, not BEE alone.
That was eight working weeks from this post’s original date of 29 May 2026. As at this update, 27 July 2026, it is four days.
Seven sectors notified, two still open
Targets are notified for aluminium, cement, chlor-alkali, pulp and paper, petroleum refining, petrochemicals and textiles. Iron and steel and fertilisers are the two CCTS sectors still without notified GEI targets as at 27 July 2026. Sector coverage is expected to reach roughly 740 entities once all nine are notified, which is an estimate reported alongside the January notification rather than a figure the rules themselves state.
If you sit in iron and steel or fertilisers, you are not outside the scheme. You are early in it, with the drafting time the first seven sectors did not get. MoEFCC issued a revised draft notification for iron and steel on 26 June 2026, made public on 2 July, proposing targets for 255 units with a first compliance year of FY 2026-27, on a sixty-day comment window. Draft, so those units are not part of the 490 and should not be added to it. Fertiliser targets have not been notified and were described as on hold at BEE’s Indian Carbon Market workshop in May 2026.
| Phase | Date | Status |
|---|---|---|
| Verified emissions report to BEE and the SDA | 31 July 2026 | The binding date |
| Iron and steel comment window closes | About 31 August 2026 | Draft stage |
| First trading window | Around October 2026 | BEE expectation, not a notified date |
What “verified MRV” means
Verified MRV is not internal MRV. It is MRV signed by an accredited carbon verification agency, and self-certification is not accepted. The verification looks at:
- Whether your emission intensity calculation matches the methodology defined in the sector notification
- Whether your data sources are documented to BEE’s data quality expectation
- Whether the chain of custody for primary measurements is auditable
- Whether your action plan, if filed, aligns with your reported baseline
The verifier is not your auditor. The verifier is the bridge between your data and BEE’s trading window. If your data architecture cannot produce the same number twice, the verification will fail.
Internal MRV exists at most obligated entities. Verifier-grade MRV is a different artefact, and it is the one the 31 July date asks for.
The action plan template problem
BEE has not published a single golden action plan template. The structure is implied across the sector notifications.
A correctly structured action plan covers:
- Baseline year emission intensity, calculated by the sector methodology
- Year-1, Year-2, Year-3 reduction trajectory aligned with the sector target
- Specific reduction levers, cost-effectiveness ranked
- Investment commitment, with internal capex sequence
- Governance structure for plan execution
Each section requires its own evidence. The action plan is not a narrative document; it is a contract with the regulator.
The eight-week sequence, and what is left of it
For an obligated entity that has filed nothing or filed inadequately, this is the defensible eight-week sequence. Read from 29 May 2026 it fits. Read from late July it does not, and the honest move is to compress it and say so to your verifier.
Weeks 1 to 2. Methodology lock. Baseline calculation following the exact sector method. Internal validation by a second analyst. No MRV system work yet.
Weeks 3 to 4. Action plan drafting in the format the sector notification implies. Investment sequence built bottom-up from your engineering team. Cost-effectiveness ranking.
Weeks 5 to 6. MRV system design. Data flow from primary measurement to reportable number documented end-to-end. Verifier walkthrough on Week 6.
Weeks 7 to 8. Verification engagement. One or two iterations with the accredited agency. Submission to BEE. Board memo on filing status.
What happens if you miss 31 July
The GEI Target Rules, 2025 are made under the Environment (Protection) Act, 1986. An entity that does not submit is treated as having achieved its baseline intensity, and the resulting shortfall attracts environmental compensation from the Central Pollution Control Board. The realistic risk profile is three-layered:
- Environmental compensation imposed by CPCB at twice the average traded certificate price for the cycle, with Environment (Protection) Act penalties only if it goes unpaid within 90 days.
- A deemed shortfall. A non-filer’s achieved intensity is taken as its baseline, so any reduction it actually made is not counted.
- Downstream commercial exposure. EU CBAM-importing buyers are already asking for verified emissions attestation. CCTS and CBAM are separate regimes with their own methodologies and verification. Steel exports are the canary; cement and chemicals follow.
The penalty itself is not the binding cost. The binding cost is the second-order commercial damage.
What to do this week
If your filing status is uncertain, three specific actions:
- Confirm your obligated status against the notification that covers your sector. The October 2025 rules and the January 2026 amendment are separate documents with separate schedules.
- Engage an accredited carbon verification agency for an exploratory call. Verifier calendars are tightest in the weeks before a submission date.
- If you do not have a draft action plan, start now. The sequencing matters more than the polish.
Our CCTS Readiness Sprint runs this sequence in 21 days: action plan, MRV system, verification readiness pack, board memo. It is built for entities behind schedule.
If that is the position you are in, the next step is a 30-minute call.
MoEFCC, Greenhouse Gases Emission Intensity Target Rules, 2025, notified as G.S.R. 739(E) on 8 October 2025. The Gazette portal is not reliably reachable outside India, so this links to ICAP's record of the notification. Read its body, not its headline: the headline says nine sectors, the body says four were notified on 8 October 2025 and five were still expected · MoEFCC, Greenhouse Gases Emission Intensity Target (Amendment) Rules, notified 13 January 2026, reported by PIB · BEE and Ministry of Power, Detailed Procedure for Compliance Mechanism under CCTS, Version 1.0, July 2024 · ICAP, Indian Carbon Credit Trading Scheme, ETS factsheet, which lists seven notified sectors and 490 entities · ICAP, Compliance obligations under India's Carbon Credit Trading Scheme enter into force for seven sectors, 30 March 2026. The corroborating source for the seven-sector count, the 490 entities and the 31 July first compliance date · Down To Earth, India's iron and steel sector moves closer to CCTS compliance, 14 July 2026, confirming the iron and steel targets were still at draft stage