CCTS Readiness Sprint
For obligated entities across the 7 sectors with notified GEI targets as at 21 November 2026, of the 9 in CCTS scope. We deliver an action plan in BEE format, an MRV system designed for verification, and a board memo.
Two tracks, one sprint.
Track A. Readiness for the next compliance year.
Targets under the GEI Target Rules, 2025 cover compliance years FY 2025-26 and FY 2026-27 against an FY 2023-24 baseline (ICAP, read 21 November 2026). A September 2026 amendment replaced the refinery and textile schedules, 21 refineries and 173 textile units; the substituted tables show no numerical FY 2025-26 target, only FY 2026-27 (Corpseed, September 2026). The verified report is due four months after the compliance year ends; for FY 2026-27 that is 31 July 2027 on the Detailed Procedure's rule (derived, not a notified date).
Track A builds the baseline, the action plan and an MRV system a BEE-accredited verifier can work with.
Track B. Remediation for entities that did not file for FY 2025-26.
The GEI Target Rules, 2025 treat a non-filer as having achieved its baseline intensity, so the shortfall is the whole gap to target. For a shortfall not covered by surrendering certificates, CPCB imposes environmental compensation at twice the average traded certificate price for the cycle, as determined by BEE, after a hearing, payable within 90 days; Environment (Protection) Act penalties follow only on non-payment.
Track B sizes that gap and builds the verified data package.
Sources: MoEFCC GEI Target Rules, G.S.R. 739(E), 8 October 2025, and amendments of 13 January 2026 and September 2026; BEE Detailed Procedure for the CCTS compliance mechanism, July 2024; ICAP CCTS factsheet, read 21 November 2026. 490 obligated entities across seven sectors as notified by January 2026 (PIB, 22 January 2026; ICAP).
Who this is for, and who it isn't.
Who this is for
- CCTS-obligated entities across the 7 sectors with notified GEI targets: cement, aluminium (primary and secondary), chlor-alkali, pulp & paper, petroleum refining, petrochemicals and textiles.
- Iron & steel entities: MoEFCC published a draft notification of targets for 255 units in July 2026, with FY 2026-27 as the compliance year.
- Facilities without an action plan prepared to the BEE format, or without an MRV system a verifier will accept.
- Plant heads, CSOs and CFOs who want the founder on every call.
- Teams running CCTS and BRSR Core cycles in the same year who need the two sequenced, not duplicated.
Not for
- Facilities wanting the verifier attestation itself. We introduce accredited verifiers; we do not sign the attestation.
Four artifacts. Each ready to ship to your board, your auditor, and BEE.
-
Entity-level emission intensity baseline
XLSX MODELCalculated against your MoEFCC-notified sector target. Defensible at audit, and drop-in ready for your action plan.
-
Action plan in BEE format
PDF PLANReduction trajectory for each notified target year.
-
MRV system design
PDF MEMOData architecture, measurement protocols and verification readiness: the system your verifier will accept.
-
Trading-readiness brief
BOARD PACKSurplus and deficit projection, hedging logic, ESCert-to-CCTS transition plan and board memo.
Three weeks. Three milestones. No drift.
- Week 1
Discovery and data
- Day 1 kickoff with plant head, environment officer and sustainability lead.
- We pull your energy data, fuel mix, production tonnage and existing carbon footprint work. Site visit if your plant geography demands it.
- End of week: baseline draft and methodology memo.
- Week 2
Methodology and action plan
- We map your baseline against the sector trajectory and identify reduction levers, ranked by cost-effectiveness.
- A plan for each notified target year, drafted in the format BEE accepts. Internal validation review on Day 10.
- Plan locked by end of Week 2.
- Week 3
Deliverables and handoff
- MRV system spec delivered to your IT and data team. Verifier-readiness pack assembled.
- Board memo drafted for the next CSC, plus a trading-readiness brief showing your projected surplus and deficit position.
- Final delivery Day 21, with a 90-minute handover session.
What's included, and what isn't.
Included
- Site visits to your obligated facilities where plant geography demands it
- Two virtual workshops with plant and sustainability teams
- All four deliverables to board-ready quality
- Handover session with your in-house team
- One round of revisions post-handover
- 30-day support window for clarifying questions
Out of scope, and where it lives
- Verifier engagement we introduce; you contract separately
- Implementation of the MRV system scoped separately
- BRSR Core gap audit BRSR Core Gap Diagnostic
- CBAM declaration layer optional add-on, scoped separately
What this sprint is built on.
- GHG Protocol Corporate Standard The inventory boundary and category classification behind your baseline.
- MoEFCC GEI Target Rules, 8 October 2025, amended 13 January 2026 and September 2026 The emission-intensity target your action plan is measured against.
- ISO 14064-1 The organisation-level standard for quantifying and reporting GHG emissions.
What buyers asked us before they signed.
Who actually delivers this?
The founder is on every engagement. Analyst support joins the data work where the scope needs it. You meet the delivery team on the Day 1 call. No bait-and-switch.
What do you need from us?
Access to your plant head, environment officer and sustainability lead for the Day 1 kickoff, plus your energy data, fuel mix, production tonnage and any existing carbon footprint work. A site visit only if your plant geography demands it.
When does our action plan need to be filed?
The Greenhouse Gases Emission Intensity Target Rules, 2025 require an obligated entity to prepare an action plan to meet its target. We have not been able to trace a statutory submission deadline for the action plan itself to a primary document, so we will not quote you one. The dated obligation is the verified GHG emissions report, due with BEE and your State Designated Agency four months after the compliance year ends. For FY 2025-26 that made 31 July 2026 the original date. Carbon Pulse reported on 8 October 2026 that the deadline for the first verified compliance data was extended by three months. We have not seen the notice that sets the new date, so confirm it with BEE before you plan around it. As at 21 November 2026 we have found no notified date for carbon credit certificate trading to begin.
What happens if we did not file for FY 2025-26?
The Greenhouse Gases Emission Intensity Target Rules, 2025 (G.S.R. 739(E), 8 October 2025) treat an entity that does not submit the required documents as having achieved its baseline intensity, so the shortfall is the whole gap between baseline and target. For a shortfall that is not covered by surrendering certificates, the Central Pollution Control Board imposes environmental compensation at twice the average price at which certificates traded in the cycle for that compliance year, as determined by BEE, after giving the entity a hearing. It is payable within 90 days, and penalties under the Environment (Protection) Act, 1986 follow only if it is not paid. Until a trading cycle sets that average price, the amount cannot be computed. The remediation track sizes that gap and builds the verified data package.
How does CCTS interact with CBAM?
CCTS and CBAM are separate regimes with their own methodologies and verification. The CBAM declaration layer is an optional add-on, scoped separately.
What happens after the sprint?
You own the deliverables. We hand off methodology documentation your team can run on its own. If you want continued support during MRV implementation, we scope a follow-on implementation engagement.
Do you sign an NDA?
Yes. We sign your standard mutual NDA before any data changes hands, and we hold your facility and production data in confidence during and after the engagement.
What does this cost?
Commercials are scoped on the first call, in writing, fixed for the engagement.
Founder-led, end to end.
The founder leads every CCTS engagement, from the Day 1 kickoff to the Day 21 handover. Analyst support joins the data work where the scope needs it. You meet the delivery team on the first call.
Kartik Ranjan · Founder & Principal Consultant
Book a 30-minute CCTS readiness call.
Tell us your sector, your facility count, and where you are on the timeline. We will tell you what the next 21 days should look like.